Jump to content

turbonator

Members
  • Posts

    30
  • Joined

  • Last visited

Posts posted by turbonator

  1. Well, 3 million in the hole, three times the trail needed to be rebuilt in several areas due to poor construction,  and no trail.... the MTQ came out sometime in the last 2 weeks and posted it all with "no snowmobiles or ATV" signs... there are still the group of dorks who are passing on it despite all of the issues, must have been at least 20 sleds on it in the last three days alone(it will be these guys that ruin it for everyone else, just like the PTN).... It is a total cluster-fuck, both by the clubs, the greed of the company who did the work, the government who did not do their job properly in the vetting process at the very start when they studied the trajectory to verify all the wet-zones, creeks and streams that need special attention... the FCMQ should be ashamed of the part they played in this as well... IMHO, this trail will never open in its current state....

  2. Think again, the ministre du transport in all of thier wisdom seemed to over-look a couple of land owners right beside the trail when they did the study and it is blocked.... they put up signs which have the round red circle and slash through with both sleds and atv all the way along from mont blanc, all the way back to gauthiers pit on the 117 on the new trail...... Heard it was already past 3 million dollars of wasted infrastructure dough....

  3. Huge work is being under-taken at the bottom of the Morrison hill, about a kilometer past my last picture, they are actually putting an entire stream under ground for approx. 500 feet, and to our count, they have already prepared for a minimum of three bridges so far, and one almost finished... So not just a bit of trimming, this turned out to be a quite expensive venture...LOL... if we had to guess, its up to $1,000,000 and counting.....J&J

  4. On 8/24/2019 at 12:23 PM, grumpysanta said:

    THANKS for info .. it will be good when done ..  trails are closing every where .  we had some re routes this year and even had to move our Warm up hut / relais do to trail closure.. No help at all from fcmq.  infact they were the cause of a lot of problems in our area.. Not at all sure of the direction of FCMQ.

    we have an old "cabane-du-carton"  here in Lac Superieur where 4 trails used to meet up,(club here closed way back in 1980) dont know if its even standing anymore, i have not been up there in the bush for 6-7 years, i have a trouble maker neighbor that calls the Po-Po if i even start a sled....LOL

  5. On 8/14/2019 at 4:22 PM, MrGutz said:

    To many options can cause issues, especially for small runs (I would think ).

    K.I.S.S. 

    Quebec Blue, Black, Grey , T-Shirts

    Let's see where it goes?

    GutZ

     

    good color choices, id be in for a couple of hoodies, and some toques, maybe with the fleur du lys on them?

  6. we did a slow drive of the entire trajectory of the new trail today, the hydro-axe work is almost finished, there is a considerable amount of excavation and modification the needs to be done in several places, but all in all the trail is right along the north-east side of the #117 highway... the groomer will actually fit quite well between the "wall" of stone on the upper portion of the morrison hill....👍

  7. The bosch CP3 has been used all through the duramax (cummins late 5.9l 24 valve and the 6.7l also use the CP3 style), although i am not sure if its the  same or not... its just pressure, the common rail is pressurized, and the injectors are electronic and do the rest, the first run of D-max injectors(2000-2004.5) were prone to cracking, and were under the valve covers and are quite a job to R&R...

×
×
  • Create New...