Jump to content

Bridge outside Parent is open


Pipeman
 Share

Recommended Posts

45 minutes ago, PISTON LAKE CRUISER said:

The size of the beams under the deck makes me think there may be some log trucks in thaat bridges future.

I thought the same thing, certianly more then required for sleds and groomers.

Link to comment
Share on other sites

Sorry I missed seeing this.  We were through Monday afternoon after the groomers first pass.  Tree limbs were certainly cleaned up quite a bit, but trail still road like doggy doo.  Ended up running road from Parent to the Bridge and it was pretty rough from the Bridge to the Gouin intersection and not much better to 345.

Link to comment
Share on other sites

Much better Wednesday from bridge going east. From Parent still mashed up you can tell was first pass for sure. Is better now I am sure with another pass. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...